KERN Industrie Automation KERN Industrie Automation
✕
  • Home
  • Company
    • Focus
    • Systems
    • Service
    • History
  • Our range of services
    • Waste water and municipal plants
    • Testing plants
    • Shearing, cutting, sawing, welding
    • Process engineering plants
    • Safety engineering
    • Rolling mill plants
    • Strip processing lines
    • Wire pickling lines
    • Secondary metallurgy
    • Strip processing lines
  • Contact
  • Service
  • English
    • English
    • Deutsch
16. October 2015Dominik Schmidt

Strip processing lines

KERN Industrie Automation can fall back on years of experience with automation of strip processing lines. All applications of strip processing lines in the iron and steel industry are already being developed and built by KERN Industrie Automation. In chemical and in thermal processing as well in for metal processing through galvanising or tin-plating.

References:

Push-pull pickling: Broad strip pickling line, CD Wälzholz, Germany
  • Modernisation of the entire electrical equipment in connection with replacement of the pickling and rinsing section
  • Conversion time 3 weeks
Push-pull pickling: Medium strip pickling line, CD Wälzholz, Germany
  • Modernisation of the entire electrical equipment in connection with replacement of the pickling and rinsing section
  • Conversion time 3 weeks
Continuous pickling: Strip pickling line, ThyssenKrupp Rasselstein GmbH, Andernach, Germany
  • Modernisation of the entire electrical equipment in connection with replacement of the pickling and rinsing section
  • Conversion time 3 weeks
Continuous pickling: Strip pickling line, Stahlwerke Bremen, Germany
  • Modernisation of the entire electrical equipment in connection with replacement of the pickling and rinsing section
  • Conversion time 2 weeks
Continuous pickling: Tandem pickling line (TaKo), ThyssenKrupp Steel Europe, Germany
  • Modernisation of the entire electrical equipment in connection with replacement of the pickling and rinsing section
  • Conversion time 2 weeks
Continuous pickling: Continuous pickling line 2 KW 4, Bochum ThyssenKrupp Steel Europe, Germany
  • Modernisation of the entire electrical equipment in connection with replacement of the pickling and rinsing section
  • Conversion time 2 weeks
 Continuous pickling: Turbulent pickling line, TKSE Duisburg Süd, Germany
  • Modernisation of the entire electrical equipment in three construction sections over 3 years. Modernisation was carried out during the rotational repair downtimes. No additional plant downtimes were required.
Continuous pickling: Continuous pickling line, Hoesch Hohenlimburg, Germany
  • Replacement of existing AEG control with Siemens Simatic S7

 

Push-pull pickling: Push-pull pickling line, Hoesch Hohenlimburg, Germany
  • Replacement of existing AEG control with Siemens Simatic S7
  • Our range of services
    • Waste water and municipal plants
    • Testing plants
    • Shearing, cutting, sawing, welding
    • Safety engineering
    • Rolling mill plants
    • Secondary metallurgy
    • Process engineering plants
    • Strip processing lines
    • Wire pickling lines
Next post Process engineering plants
white

KERN Industrie Automation
GmbH & Co.KG
Bergstraße 63a
56203 Höhr-Grenzhausen

Tel.: +49 2624 / 94 71 2-0
Fax: +49 2624 / 94 71 2-99
E-Mail: info@k-i-a.de

  • Home
  • Terms & Conditions
  • Data protection
  • Legal notice
  • Remote service
  • Facebook
  • LinkedIn
© 2024 Tabula rasa & Kern Industrie Automation GmbH & Co. KG